Breadcrumb Home Video The main stages in drilling a borehole Video The main stages in drilling a borehole Share Drilling of a borehole in Issoudun so as to be able to constantly measure the level of the Berry water table. 15 June 2015 Groundwater management Centre-Val de Loire Discovering the Earth Sciences Citizen, citizen's group Student Teacher, pupil The main stages of the drilling operation – using the "Down-the-hole hammer" method. Example of a borehole in Issoudun, the objective being to monitor level of the Berry water table (Upper Jurassic limestone). In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014). © BRGM Visit BRGM's YouTube channel Other news Newsletter BRGM Infos newsletter for March 2025 14 March 2025 Article Nature-based solutions for adapting to climate change 27 February 2025 All the news
In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014).