Breadcrumb Home Video The main stages in drilling a borehole Video The main stages in drilling a borehole Share Drilling of a borehole in Issoudun so as to be able to constantly measure the level of the Berry water table. 15 June 2015 Groundwater management Centre-Val de Loire Discovering the Earth Sciences Citizen, citizen's group Student Teacher, pupil The main stages of the drilling operation – using the "Down-the-hole hammer" method. Example of a borehole in Issoudun, the objective being to monitor level of the Berry water table (Upper Jurassic limestone). In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014). © BRGM Visit BRGM's YouTube channel Other news Article Tolkien and landscapes: a geological journey through Middle-earth 11 September 2024 Video Subsurface knowledge: imaging the geology of the Massif Central 10 September 2024 All the news
In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014).