Breadcrumb Home Video The main stages in drilling a borehole Video The main stages in drilling a borehole Share Drilling of a borehole in Issoudun so as to be able to constantly measure the level of the Berry water table. 15 June 2015 Groundwater management Centre-Val de Loire Discovering the Earth Sciences Citizen, citizen's group Student Teacher, pupil The main stages of the drilling operation – using the "Down-the-hole hammer" method. Example of a borehole in Issoudun, the objective being to monitor level of the Berry water table (Upper Jurassic limestone). In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014). © BRGM Visit BRGM's YouTube channel Other news Newsletter BRGM Infos newsletter for April 2024 18 April 2024 Press release Groundwater tables on 1 April 2022 16 April 2024 News Signing of an agreement between BRGM and the Canadian Geological Survey 5 April 2024 News How can the insurance sector adapt to climate change? 4 April 2024 News International: BRGM signs an agreement with the Republic of Uzbekistan 4 April 2024 News Limiting the impact of lithium extraction in Bolivia 3 April 2024 All the news
In 2014, the structure was fitted with equipment to constantly measure the water table level. Film produced for the SIGES Centre (Indre, 2014).